What is the difference between fmea and fmeca




















Because there are various types of FMEAs, sometimes a qualifier prefix may be used. You can also spell out all 5 letters, but that tends to get a bit long! As you can see from the description of the procedure, FMEAs are best performed collaboratively with a team of engineers and analysts across all elements of the product or process lifecycle — from design, to development, to production, and to deployment. FMEA documents are best utilized as living documents so that the product, process, or system is evaluated throughout the lifecycle to maintain and continuously improve reliability and quality.

When performing a Design FMEA, you begin by defining the system hierarchy, or the breakdown of all the individual components of your product. The breakdown can be as detailed as you like. For example, you may start your DFMEA early in the design phase when a high-level breakdown is available, and then as your design matures, continue to refine that breakdown into lower level elements. Once your product design is broken down into components, you analyze the potential failure modes of each element.

You then follow the remaining steps of the FMEA procedure as described earlier. DFMEAs are use to analyze a product during the design stage.

Their main purpose is to ascertain and mitigate critical effects of failures prior to manufacture and deployment. Your cost is limited to the engineering time for redesign. Moving onto production, if a problem is uncovered, the resulting costs go up tremendously. Production shutdown, re-engineering, retest, and restarting production are costly and ineffective.

Lastly, failures uncovered in the field are the most costly. You may be facing recalls, product replacement, and repairs, as well as all the costs associated with determining the root cause and necessary corrective actions. Add to that the almost immeasurable cost of harm to your reputation and company standing, and you can see why eliminating problems early on is key to business success.

You can track pass and fail testing, as well as keep track of progress and issues that may arise. In this ppt there is mentioned that the criticality analysis can be quantitative or qualitative. As I have no accurate failure data, the only option is an qualitative approach. This means that I have to rate every failure mode with A till E and that's it? Impressive criticality 'analysis'! All this conflicting information does not really make it easy for me.

I hope I made my problem clear and that someone can help me with this problem. Add Reaction. RM Registered Member. Multiplying these 3 gives a criticality number of Thus each failure mode gets a rank based on these 3 numbers.

Subjectivity is reduced by using a team approach. Confidence is largely based on our ability to 'catch' each failure mode in time. Thus a hidden failure will have a high number, while an easily detectable failure gets a low number. The ranking number, or RPN weights each risk rank Prob. Vee, Thanks for taking the time to explain the topic. But still it is not clear to me.

Correct me if I'm wrong.. By adding a Detection probability factor or confidence factor, we add a third variable. We are not using the actual probability, we use a number to show probability from negligible to extermely high on a scale.

Similarly we assign for negligible to catastrophic on the consequence scale. Lets say these form the X and Y axes. We now add a Z axis to represent detectability on a scale. So we take the Risk number on a and multiply it by the Detectability number. The RPN is thus on a scale.

So a low risk or criticality item, if it is a hidden failure can have a relatively high RPN. Process Improvement. Leadership Development Programme. Lean Transformation. NPI Technical Assessment. Automotive NPLX. Automotive Training. Aerospace Training. Virtual Learning instructor led.

AIAG Publications. IATF Publications. VDA Publications. Even though these methods share similarities, they are not one and the same. As a business owner, it's important to understand the differences between the two so you can implement them in your organization.

Failure mode and effects analysis has been around since the s. Today, this method is widely used in the space, aircraft and electronic industries. Its role is to identify potential problems that may occur in the manufacturing, assembly and design processes. Basically, it helps detect errors or failures that may affect a product's quality. The RPN risk priority number helps estimate the likelihood of failure, its severity and the effectiveness of corrective actions. It is calculated by multiplying these three variables.

The information provided by this method helps determine the impact of a potential failure on products or processes.